Pentagon Frets Sequester Cuts; Wastes $1.5T on DOA Fighter Jet


Recommended Posts

Posted

Pentagon Frets Billions in Sequester Cuts But Wastes $1.5 Trillion on Non-Working Fighter Jet

The Fiscal Times notes that...the Pentagon announced that it was grounding its F-35 fighter jets, which were approved during the Clinton administration (look it up kids). Fiscal Times reports:

This was the second time in two months the plane has been taken out of service....after this latest failure, the problems with the F-35 are simply too numerous to ignore.

Equally impossible to ignore is the $1.5 trillion price tag for one of the biggest failures in Pentagon history. $1.5 trillion is the cost of operating the air craft for 55 years, an amount that has been consistently increased as the program drags on. It’s the most expensive weapons system the Pentagon has ever commissioned. And as problems mount, there are growing concerns that the F-35 will never fly a combat mission.

Because of competing claims among service branches, the Marines, the Navy, and the Air Force all got their own, specially tricked out versions, each of which is dysfunctional in its own way:

The Pentagon ordered nearly 2,500 planes for $382 billion, or fifty percent more than the original cost.

As the price soared, the Pentagon in 2010 deemed the program “too big to fail.” Yet it continues to fall short. Recent engine troubles are just the latest in a series of mechanical failures. A pilot was killed when oxygen to the cabin was cut off. The aircraft are running too hot, limiting their ability to operate in warm environments.

The original delivery date was supposed to be 2010. Then it was delayed until 2012. Now, it’s not expected to be in service until 2019.

And there's this kicker: "If the F-35 order is filled, DOD will have 15 times as many planes as China." And 20 times as many as Russia.

×
×